Conversion and expansion of the road
For the construction project, construction work is to be carried out in the area of traffic facilities.
Asphalt milling: surface course approx. 7,610 m2
Asphalt milling: binder layer approx. 7,750 m2
Asphalt milling: base course approx. 7,900 m2
Oberbodenabtrag ca. 8.100 m3
Oberbodenandeckung ca. 18.650 m2
Installing deadwood fascines approx. 1,650 m
Bodenabtrag ca. 16.500 m3
Bodenverbessserung ca. 11.950 m3
Contract for dam construction approx. 23,500 m3
Produce frost protection layer approx. 5,850 m3
Making banquets approx. 2,500 m
Hollows approx. 1,900 m
Sealing the bottom of the trench approx. 600 m2
Establish a seepage pipeline approx. 1,200 m
Culverts DN 300 to DN 500 produce approx. 71 m
Establish a DN 800 culvert approx. 38 m
Construct RW duct DN 400 to DN 500 approx. 1,200 m
Root protection in the canal trench approx. 120 m2
Refurbishment preh. Total canal length approx. 550 m
Gussashalt ca. 1.300 m2
Splitmastixashalt ca. 8.550 m2
Asphaltbinder approx. 9.950 m2
Asphalttragschicht approx. 10.050 m2
Fahrzeugrückhaltesysteme ca. 650 m
Longitudinal marking, continuous approx. 2,700 m
Longitudinal marking, interrupted approx. 1,150 m
Roundabout 1 piece - diameter 50 m
Natursteinborde ca. 160 m
Rainwater retention basin 1 piece - volume approx. 490 m3
Reinforced concrete special shafts 2 pieces
Traffic routing for 2 main and 4 partial construction phases during the construction period
with partly large-scale diversions 5 pieces