Construction of a bridge structure for the overpass of the B 10 federal highway over a service road
The bridge structure consists of a rigid frame construction without bearings or joints with a foundation as a deep foundation over bored piles to secure the embankment a boarded-up shotcrete shell is to be produced.
- Brückenfläche: ca. 180 m2
- Earthworks: approx. 4600 m3
- Concrete work: approx. 2050 m3
- Shotcrete: approx. 190 m2