Waste-treatment plant construction work | Tenderlake

Waste-treatment plant construction work

Contract Value:
-
Notice Type:
Contract award notice – utilities
Published Date:
27 December 2021
Closing Date:
Location(s):
NO074 Troms og Finnmark (NO Norway/NORGE)
Description:
New Waste-to-Energy facility in Finnsnes

This Tender regards the new EfW Plant with the purpose of producing energy from waste, to be distributed as district heating via the connected district heating distribution network (not a part of the Works). The Energy-from-Waste plant is to be based on a moving grate concept, hot water boiler followed by semi-dry flue gas treatment using bi-carbonate, including an ORC system, electrical system, control and monitoring system, district heating connections and all necessary auxiliary systems.

This Tender regards the new EfW Plant with the purpose of producing energy from waste, to be distributed as district heating via the connected district heating distribution network (not a part of the Works). The Energy-from-Waste plant is to be based on a moving grate concept, hot water boiler followed by semi-dry flue gas treatment using bi-carbonate, including an ORC system, electrical system, control and monitoring system, district heating connections and all necessary auxiliary systems.

Awarded to:
New Waste-to-Energy facility in Finnsnes
Verdo Energy Systems A/S, Randers (DK)
Download full details as .pdf
The Buyer:
Senja Avfall IKS
CPV Code(s):
42300000 - Industrial or laboratory furnaces, incinerators and ovens
42320000 - Waste incinerators
45222100 - Waste-treatment plant construction work
45251000 - Construction works for power plants and heating plants