Modernization of roads and bridge in the Zgierz County
Task 1. Reconstruction of the road – execution of an overlay on the district road No. 5140 E between Adamówek Street and Nowe Miasto Street – Starzyńskiego Street in Ozorków to the railway tracks.The subject of the contract are construction works consisting in the renovation of Adamówek, Starzyńskiego and Nowe Miasto streets in Ozorków with the following lengths: Adamówek street on the section of approx. 1 588 m, i.e. in km from 0+000 to 1+588, Starzyńskiego street on the section of approx. 463 m and Nowe Miasto street on the section of approx. 111 m;
3) As part of task No. 1, the following works are planned to be carried out:
(a) geodetic measurements;
(b) the development of temporary traffic organisation;
c) levelling milling of the road surface;
(d) demolition of existing road features such as curbs, exits, if necessary;
(e) cleaning and sprinkling of the road surface;
f) leveling the existing surface with a mineral and asphalt mixture;
g) making a wear layer from a mineral and asphalt mixture;
h) repair of roadsides made of crushed aggregate;
i) height ratio of the surface of exits and sidewalks with frames
if necessary;
(j) height adjustments of existing network elements;
(k) replacement and renewal of existing road markings and road markings;
l) as-built geodetic inventory.
Task 2. Reconstruction of the district road No. 5115 E Wola Mąkolska – Popów Głowieński.The subject of the contract are construction works consisting in the reconstruction of the county road No. 5115 E Wola Mąkolska - Popów Głowieński on the section from Dz. No. 152 (precinct Jasionna) to Dz. No. 53/3 (precinct Władysławów Popowski) with a length of approx. 3 025 m.
As part of task No. 2, the following works are planned to be carried out:
a) tree felling - the tree after felling should be deposited in a place designated by the Ordering Party at a distance of up to 10 km, it is the property of the Ordering Party, branches from tree felling are the property of the Contractor;
b) reconstruction of the road surface and shoulders;
(c) reconstruction and construction of intersections;
(d) construction of exits;
(e) construction of roadside ditches and culverts;
(f) carrying out compensatory plantings;
(g) the implementation of road markings and road markings;
h) installation of road barriers.
Task 3. Renewal of the surface in the district road No. 5168 E section Aleksandrów Łódzki – Łęczyca on the section Parzęczew – Borszyn.The subject of the contract are construction works consisting in the renovation of the district road No. 5168 E section Aleksandrów Łódzki – Łęczyca on the section between Parzęczew and Borszyn with a length of approx. 3 848 m.
As part of task No. 3, the following works are planned to be carried out:
a) preparatory works (geodetic stakeouts, temporary traffic organisation);
b) demolition works (milling of road surfaces, demolition of existing culverts, sidewalks and exits);
(c) earthworks (trenches, embankments, excavations for the restoration of an existing roadside ditch);
d) road surface;
e) execution of surfaces of descents and sidewalks together with substructures;
f) execution of roadsides from crushed aggregate;
(g) height adjustment of existing, paved descents and elements of existing networks;
(h) the implementation of the marking and the horizontal markings;
(i) securing existing networks;
(j) the implementation of target green spaces;
k) staking out and geodetic inventory of the building.
Task 4. Reconstruction of the district road No. 5109 E along Gieczno – Lorenki – Kwilno.The subject of the contract are construction works consisting in the renovation of the district road No. 5109 E section Gieczno – Lorenki – Kwilno on a section with a length of approx. 4 740 m.
As part of task No. 4, the following works are planned to be carried out:
a) preparatory works (geodetic stakeouts, temporary traffic organisation);
b) demolition works (milling of road surfaces, demolition of existing culverts, sidewalks and exits);
(c) earthworks (trenches, embankments, excavations for the restoration of an existing roadside ditch);
d) road surface;
e) execution of surfaces of descents and sidewalks together with substructures;
f) execution of roadsides from crushed aggregate;
(g) height adjustment of existing, paved descents and elements of existing networks;
(h) the implementation of the marking and the horizontal markings;
(i) securing existing networks;
(j) the implementation of target green spaces;
k) staking out and geodetic inventory of the building.
Task 5. Construction of the district road No. 5163 E in Głowno, Torowa/Ziewanicka Street.The subject of the contract are construction works consisting in the reconstruction of the district road No. 5163 E in Głowno along Torowa/Ziewanicka streets on a section of approx. 371 m long;
As part of task No. 5, the following works are planned to be carried out:
(a) demolition works (demolition of existing surfaces, milling of bituminous surfaces with export);
(b) earthworks (trenching, excavation, embankments, profiling and compaction);
(c) execution of evaporation muldes;
d) execution of pavement framing, exits;
e) execution of the pavement foundation, exits;
f) pavement and exits;
g) execution of the road surface foundation;
h) roadway surface and shoulders;
(i) the implementation of the vertical and horizontal markings;
(j) securing existing networks (regulation);
(k) the implementation of target green spaces;
l) staking out and geodetic inventory of the construction object
Task 6. Construction of a bridge over the Bzura River in Ruda Bugaj along the district road No. 5168 EThe subject of the contract is the design and execution of construction works for the demolition of the existing and construction of a new bridge over the Bzura River in Ruda Bugaj, Aleksandrów Łódzki commune, Zgierz poviat.
As part of task No. 6, the following works are planned to be carried out:
a) design and execution of construction works for the demolition of the existing and construction of a new bridge over the Bzura River along the district road No. 5168 E, in the town of Ruda Bugaj, Aleksandrów Łódzki commune, Zgierz poviat;
b) design and execution of rainwater drainage from the designed bridge and the road section constituting access roads to the bridge – construction of a rainwater sewage system;
c) design and reconstruction of conflicting utilities, i.e. water supply network and overhead telecommunication line, construction of technological channels;
(d) reprofiling and strengthening of the river bed within the bridge.