Bayreuth sewage treatment plant
- Ausbaupaket A -
Structural work, energy centre and social building
Dewatering work (open dewatering)
approx. 1.100 m3 Bodenabtrag
approx. 3.700 m3 Baugrubenaushub
approx. 900 m3 ballast base course as bedding layer
approx. 5.000 m3 Baugrubenverfüllung
approx. 2,700 m3 reinforced concrete
approx. 340 t reinforcing steel
approx. 100 m2 KS masonry d 11.5 cm
approx. 770 m2 KS masonry d 24 cm
approx. 20 m2 KS masonry d 30 cm
approx. 500 m2 load-bearing thermal insulation under floor slab
approx. 400 m2 Perimeterdämmung
approx. 1,680 m plastic piping system for hot and cold water installation (industrial surface heating)