Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 February 2022
Closing Date:
25 February 2022
Location(s):
FI1B Helsinki-Uusimaa (FI Finland/SUOMI / FINLAND)
Description:
Lohjan Vuokra-asunnot Oy, Mäntynummentie 23 basic adjustment of heating network AND replay of the district heating subdivision centre - chore quotation request

New thermostats, radiator valves, air screws and down-close plugs will be installed in the radiators of the building heating networks, and line shut-off and line control valves will be renewed. Some of the radiators will also be renewed.

All demolitions, as well as re-isolation work with coatings, are part of the chore where it is necessary for the implementation of the works. The drainage, flushing and filling works of networks and their expression at least two times are part of the chore, so that the heating network operates smoothly under the conditions where it is possible within the framework of this work.

During the chore, the contractor marks the deviations they perceive in the drawings, such as the size *and type* of radiators, valve size*, the size* of the climbs and their correct location with respect to the radiators, as well as other deviations between drawings and reality. Entries are made in one additional set to be handed over to the contractor, where the contact details of the author of the entries will also be entered.

*The contractor should inspect the sizes, types and valve sizes of all radiators at the start round, as well as the pipe measures of the frame breeds visible in the apartments prior to the start of the actual installation work. Any deviations will be addressed at the very beginning of the chore and the designer will draw up the necessary repairs.

See more detailed work content: HVAC job explanation and works illustrations.

In addition, the property's district heating subdivision center package will be renewed:

All demolitions, as well as re-isolation work with coatings, are part of the chore where it is necessary for the implementation of the works.

The drainage and filling of networks, as well as their expression, are also part of the chore in such a way that the heating network works flawlessly

conditions as possible within the framework of this work.

Automation and electrification work is done as a builder's separate order. Asbestos work is not covered

the chore and the subscriber is responsible for possible disruptive bubbles.

Further details are presented in the attached works fishing materials.

New thermostats, radiator valves, air screws and down-close plugs will be installed in the radiators of the building heating networks, and line shut-off and line control valves will be renewed.

Some of the radiators will also be renewed. All demolitions, as well as re-isolation work with coatings, are part of the chore where it is necessary for the implementation of the works. The drainage, flushing and filling works of networks and their expression at least two times are part of the chore, so that the heating network operates smoothly under the conditions where it is possible within the framework of this work.

During the chore, the contractor marks the deviations they perceive in the drawings, such as the size *and type* of radiators, valve size*, the size* of the climbs and their correct location with respect to the radiators, as well as other deviations between drawings and reality. Entries are made in one additional set to be handed over to the contractor, where the contact details of the author of the entries will also be entered.

*The contractor should inspect the sizes, types and valve sizes of all radiators at the start round, as well as the pipe measures of the frame breeds visible in the apartments prior to the start of the actual installation work. Any deviations will be addressed at the very beginning of the chore and the designer will draw up the necessary repairs.

See more detailed work content: HVAC job explanation and works illustrations.

In addition, the property's district heating subdivision center package will be renewed:

All demolitions, as well as re-insulating work with coatings

to the extent that it is necessary for the implementation of the works.

Also, the emptying and filling of networks in the necessary respects, as well as their expression

part of the chore so that the heating network works flawlessly on them

conditions as possible within the framework of this work. Automation and

electrification work is carried out as a builder's separate order. Asbestos work is not covered

the chore and the subscriber is responsible for possible disruptive bubbles.

Further details are presented in the attached works fishing materials.

Download full details as .pdf