- Air-cooled chiller 132 kW with water-glycol circuit;
- refrigeration center with heat exchanger, buffer storage, pumps, main distribution;
- approx. 150 m of copper pipe pressed for condensate network, cooling network 62 kW for convection cooling units approx. 20 hours in operating rooms;
- approx. 815 m copper pipe, alternating temperature network 61 kW heating / cooling through active graphite-containing GK ceiling system;
- approx. 1 800 m steel pipe black with cold corrosion protection coating DN15 to DN100.
- Air-cooled chiller 132 kW with water-glycol circuit;
- refrigeration center with heat exchanger, buffer storage, pumps, main distribution;
- approx. 150 m of copper pipe pressed for condensate network, cooling network 62 kW for convection cooling units approx. 20 hours in operating rooms;
- approx. 815 m copper pipe, alternating temperature network 61 kW heating / cooling through active graphite-containing GK ceiling system;
- approx. 1 800 m steel pipe black with cold corrosion protection coating DN15 to DN100.