This project includes planning services to complete the preliminary planning and preparation of the design and approval planning.
The illerdeicke from dike station 0+000 to 5+950 does not correspond to the height or the internal structure to the other right. d. With a planning concept, two variants in the preliminary planning to improve the HWS are therefore to be discussed.
1. dikes according to the A.A.R.D.T. dyke recirculation
2. Renovation of dikes in stock according to a.a.r.d.t. relative to the current crown height
After the AG has determined a preferential variant, it is to be planned until approval planning.
Services to be provided are hydraulic engineering planning, geotechnical engineering and surveying, as well as the associated environmental planning.
Engineering Services Engineering Structures, Geotechnics, Environmental Planning
Service phases 1 to 4
New construction and repair