Planning services for outdoor facilities in accordance with §§ 38 et seq. HOAI for outdoor facilities
for the redesign of the schoolyard for the extension of the Michael-Peoschke-Schule, phases 1 - 9
The Office for Facility Management of the City of Erlangen is planning to build in the east of Erlangen, on the
plot of land with the plot no. 1946/492 (Liegnitzer Straße 22; 91085 Erlangen), the new construction of a
Part of the building as an addition to the existing buildings of the Michael Poeschke School. In this context,
The outdoor facilities of the building perimeter, the schoolyard area and the southern part of the building are to be renovated.
be redesigned.
The task will be to create the outdoor facilities in an appropriate manner and to meet the needs of
users and approximately 350 pupils, and to ensure the drainage and retention of the
surface water.
Due to the structural specifications, the open space planning can be divided into four areas:
1. South of the new building facing Ratiborer Strasse is the main service for the new building.
This area must be used as a connection to the road as a way of overcoming differences in altitude.
accessible by means of ramps and staircases.
2. Between the new building and the existing building, a lowered courtyard area will be created. The static
relevant support of the differences in height is part of the services provided by the
Construction. The design of the "creative courtyard" becomes part of the outdoor facility planning.
3. A large terrace area is to be created at the new building, which will serve as an outdoor area for the canteen.
can be used.
4. The entire existing schoolyard, which will be given its atrium character by the new building,
needs to be redesigned. In particular, the old tree population,
partly in raised beds, to be taken into account and included in the planning.
Overall, the area should meet the requirements of a playground use. Areas
different focal points, such as movement including a climbing frame (especially
climbing frame is to be relocated and integrated into the new planning) and areas
for racing, as well as areas for sitting and rest areas. Furthermore, the
connection to the buildings, as well as access to the adjacent sports field and the forest
similar area of play opportunities. In the redesign of the
playground and the development of the playground is also important for the inclusion of physically impaired
children.
In the south-western area of the schoolyard there is a wooded area. Here is the forest
law. Existing playground equipment should be preserved and continue to be playable.
The construction work will be carried out during ongoing school operations. For the preparation of the
As a result, several construction phases will be necessary, which will be completed without major interruption.
should be conducted. Part of the playground must always be usable during the construction phase.
For all vegetation areas, a two-year completion maintenance and a three-year development period
care of the development.
page 2 of 3
In Erlangen, the playgrounds are open to the public after school hours and on weekends.
open. For this reason, particular emphasis is placed on stable and vandalism-proof design
in order to minimise subsequent costs.
The processing area is approx. 3,900 m2 (see enclosed overview with the processing
embrace).