The dike section to be planned "AB Schönhausen km 49.95-50.70" is located in the district of Stendal, in the district of Schönhausen (Elbe). As part of the planning, the height of the dike crown must be adapted to the current assessment flood 05/2015. A berm is to be grown on the land-side embankment. Since the areas of the construction site are declared as suspected explosive ordnance areas, the procurement document for explosive ordnance clearance must be drawn up as part of the planning.
The preferred variant has already been determined by the LHW. It is a production of the proper condition of a dike on the existing route according to the recognized rules of technology, with the addition of a landside berm and the production of the freeboard on the dike crown. Different planning variants are therefore not to be considered when processed by the contractor of service phases 3 to 4.
The following services are to be provided (LS1):
- Object planning of civil engineering structures according to § 43 HOAI 2021 LPH 2-4
- Structural design according to § 51 HOAI 2021, LPH 4
- Landscape conservation accompanying plan according to HOAI 2021 § 26 and §31, LPH 3-4
- Planning and preparation of the complete procurement document for explosive ordnance clearance, with proof of §7 SprengG and proof of §20 SprengG of the planner
The following services are to be provided (LS2):
- Object planning of civil engineering structures according to § 43 HOAI 2021 LPH 5-8
- Outdoor facilities (LAP) HOAI 2021 §39 and §40, LPH 3-8
- Explosive ordnance clearance - Construction management and local construction supervision, with proof §7 SprengG as well as proof §20 SprengG of the planner / the öBü