3.1 The subject of the contract is the performance of a service under the name "Design Documentation Construction of a Multifunctional Development Center in Świdnik"
3.2 The scope of the subject of the contract includes:
1) preparation of design documentation "Construction of a Multifunctional Development Center in Świdnik" along with obtaining a building permit,
2) performing multi-discipline copyright supervision (covered by the right of option).
3.3 The scope of the subject of the contract includes, in particular:
1) Documentation
(a) design documentation,
(b) Opinions, arrangements, applications, licences,
c) Technical specifications for the execution and acceptance of construction works,
d) Bill of quantities, Investor's cost estimate, Blind cost estimate.
2) Author's supervision
The contractor will exercise multi-discipline author's supervision.
3.1 The subject of the contract is the performance of a service under the name "Design Documentation Construction of a Multifunctional Development Center in Świdnik"
3.2 The scope of the subject of the contract includes:
1) preparation of design documentation "Construction of a Multifunctional Development Center in Świdnik" along with obtaining a building permit,
2) performing multi-branch copyright supervision (covered by the right of option).
3.3 The scope of the subject of the contract includes, in particular:
1) Documentation
(a) design documentation,
(b) Opinions, arrangements, applications, licences,
c) Technical specifications for the execution and acceptance of construction works,
d) Bill of quantities, Investor's cost estimate, Blind cost estimate.
2) Author's supervision
The contractor will exercise multi-discipline author's supervision.
3) The Contractor shall develop:
a) construction and technical projects of all industries (construction and construction, road, sanitary, electrical, etc.), bills of quantities, investor cost estimates, blind cost estimates, detailed technical specifications for the execution and acceptance of works,
b) construction and technical projects for the removal of collisions with underground and above-ground infrastructure related to the construction of the facility in question (in accordance with the conditions for removing collisions obtained from the owners of individual networks after the approval of the Ordering Party),
c) land development project in the field of greenery related to the construction of the facility in question,
d) BIOZ information,
e) water law report and obtain a decision of a water law permit (optionally – if it is required by the applied design solutions),
f) a plan for the felling of trees and shrubs, and a planting plan (optional – if required),
(g) the project of permanent traffic organisation and obtain approval by the traffic management body,
h) a traffic organisation project for the duration of the works and obtains approval by the traffic management body,
i) performing geotechnical surveys of the ground and determining the geotechnical conditions for the foundation of a construction object based on the provisions of the Regulation of 25 April 2012 on determining the geotechnical conditions for the foundation of construction objects (Journal of Laws of 2012, item 463).
4) The Contractor will acquire:
a) the final decision of the water permit (if required),
b) the final decision on the environmental conditions of consent for the implementation of the project (optionally – if required),
(c) the decision building permit.
5) The Contractor shall also obtain by his efforts and at his own expense:
a) an up-to-date map for design purposes with lines from mpZP (numerical version, vectorized in dxf format),
b) extracts from the land register or other documents issued by the authority keeping the land and buildings register, allowing the parties to the proceedings to be identified, containing at least the numbers of the cadastral parcels and, if disclosed: the numbers of their land and mortgage registers, the name and surname or the name and address of the registration entity, covering the envisaged area on which the project will be carried out and covering the area, which will be affected by the project,
c) a statement on the right to dispose of real estate for construction purposes,
d) conditions and arrangements from network operators,
e) derogation from technical and construction regulations (if necessary),
(f) the necessary decisions, technical conditions for design, opinions and agreements.
3.4 The detailed scope of the subject of the contract results from the following documents:
1) SWZ, including in particular the Functional and Utility Program constituting Annex 1 to the SWZ,