tiling and screed work
Aquasport GmbH intends to partially dismantle the existing indoor swimming pool Einsiedlerbach an Hameln, to renovate it and to use
Enlargement.
The total output of this work is essentially divided into:
- approx. 1000 m2 waterproofing on raw concrete
- approx. 290 m2 cement screed on insulation layer
- approx. 130 m2 synthetic resin sealing on ground screed
- approx. 500 m2 of levelling screed/filling/insulation
- approx. 1430 m2 of slope production with cement mortar
- approx. 1630 m2 cement screed on separation layer
- approx. 1720 m2 floor tiles, unglazed porcelain stoneware, up to R10/B, formats 5x5 to 30x60cm, composite waterproofing
- approx. 930 running meters wall connection base tiles
- approx. 370 m2 wall tiles, glazed earthenware, format up to 30x60cm, composite waterproofing
- approx. 135 running meters gratings surge channel, rollable
- ca. 77m2 Spraypark, Fugenloser Fallschutzbelag DIN 1177, Gummigranulat
- ca. 15 m2 Sauberlaufzonen