lot 01: Civil engineering works for the 400hz power supply, the replacement of a section of HV loop and the installation of a new Hta substation
Tf : Civil Works 400hz to substations C3 and D1
To1 : Civil engineering works for Hta station
To2: Civil engineering works for HV loop section between the power plant, the new HV substation and substation F
To3: Civil Works 400hz to substations C1 and C2
Lot 02: BT power works to 400hz equipment, HT for the replacement of a section of the loop and installation of a new HV substation and A9 mast displacement
Tf : Work supplying equipment for substations C3 and D1
To1: Supply, installation and connection of a HV substation and replacement of a loop section (H.T.).
To2: Equipment supply work for stations C1 and C2
To3: Work for the removal of the A9 mast and the installation of a new light tower
PSE1: Increase in the service index of the new TGBT
Civil works for the 400hz power supply, the replacement of a section of HV loop and the installation of a new HV substationTf : Civil Works 400hz to substations C3 and D1
To1 : Civil engineering works for Hta station
To2: Civil engineering works for HV loop section between the power plant, the new HV substation and substation F
To3: Civil Works 400hz to substations C1 and C2
LV supply works to 400hz equipment, HT for the replacement of a section of the loop and installation of a new HV substation and A9 mast displacementTf : Work supplying equipment for substations C3 and D1
To1: Supply, installation and connection of a HV substation and replacement of a loop section (H.T.).
To2: Equipment supply work for stations C1 and C2
To3: Work for the removal of the A9 mast and the installation of a new light tower