Construction site equipment / lane change:
1st construction fence 450 m,
2. Marking lines route 900 m,
3. Tree felling, diameter: 30 cm 43 p.,
4. Remove hedges / bushes 350 qm,
5. Widen the existing carriageway by 100 cm including the substructure 225 m,
6. gravel layer for storage areas / container parking space 3 500 sqm,
7. Remove the top shelf, d = 30 cm 3,000 qm,
8. Remove pavement / grass pavers 500 square meters,
9. Lightning protection earthing incl. Earthwork 300 m,
10. Cable protection tube including earthworks 550 m,
11. Pipe trenches and underground pipes 100 m,
12. Concrete slab for container system, d = 20 cm 675 qm,
13. Structural steel for base plate 12 tons.
Site equipment.