Electrical fitting work | Tenderlake

Electrical fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
10 July 2019
Closing Date:
12 August 2019
Location(s):
DE254 Nürnberg, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
MuFu electrical installation

Electrotechnical and low-power building equipment of the multifunctional hall in the Studio Franken, Bayerischer Rundfunk.

Electrotechnical and low-current

Building equipment for the multi-functional hall in the Studio Franken, Wallensteinstraße 117, 90431 Nuremberg

Services:

- Building main distributor AN / AEV,

- 9 pc. Circuit breakers,

- 16 000 m of cables and wires,

- 3 000 m of cable trays, channels, pipes,

- 8 St. floor tanks,

- 15 St. wall junction boxes,

- 420 pieces of installation equipment,

- 1 pc emergency call system handicapped toilet,

- KNX components,

- 255 pcs. Lights General lighting,

- 1 St. central battery system with 115 escape sign / emergency lights.

Monitoring modules for general lighting:

- equipotential bonding system,

- construction lighting,

- external and internal lightning protection,

- Fire protection measures.

Download full details as .pdf
The Buyer:
Bayerischer Rundfunk Zentraleinkauf
CPV Code(s):
45310000 - Electrical installation work
45311200 - Electrical fitting work
45317000 - Other electrical installation work