The work consists of (general description):
- earthworks in excavated material and embankments
- the construction of embankments, with filler materials and reuse of site materials
- associated works: installation of anti-burrowing fences, barriers and slides, topsoil, grassing of embankments, reforestation, ...
- supply and implementation of riprap,
- the implementation of gabion mattresses,
- the creation of tracks and access for the maintenance and supervision of structures,
- the realization of draining trenches.
Earthworks and HRDThe work consists of reinforcing and restructuring approximately 1.8 km of:
- Main quantities of lot 1:
- excavated: approximately 40,000 m3,
- embankments: approximately 36,000 m3,
- supply and installation of Gabions mattresses: approximately 5,000 square meters,
- supply and installation of riprap: approximately 34 000 tonnes,
- concrete track: approximately 3,200 square metres,
- topsoil installation: approximately 5,500 m3;
Revegetation of slopes and restoration of riparian forestsThe work consists of reinforcing and restructuring approximately 1.8 km of:
- Main quantities of lot 2:
- seeding: about 26,000 square meters,
- plantations (trees, shrubs, shrubs): about 1,300 units