The construction project is the general renovation of the primary and secondary school in
Höchstädt (Danube). This building is the part of the building from the 60s and its extension from the 90s.
Both parts of the building have a basement and extend
over a total of 4 floors. (KG, ground floor, 1st floor, 2nd floor)
402 Sanitary installation according to DIN 18381:
approx. 354 m Dismantling of sewage pipes made of cast iron pipe
approx. 585 m Dismantling of drinking water pipe made of galvanized pipe
approx. 76 pcs Dismantling furnishings
approx. 432 m sewage pipes made of jointless cast iron pipe
approx. 571 m stainless steel drinking water pipes
approx. 45 taps
1 pcs automatic domestic water station
1 Softening system
66 pcs. mounting racks WC/WT/urinals
66 accessories