The services, which are the subject of this framework agreement, concern: - Maintenance and repair work on road joints and pavements on existing engineering structures. - It includes site installations, execution studies and all the work necessary for the replacement and connection of pavement joints. The types of gaskets to be replaced are: - Comb gaskets - Hiatus gaskets - Improved coated gaskets
Lot 1: Replacement of improved coated joints on engineering structures (North Network & Opal Coast)The work consists of replacing existing pavement joints on existing engineering structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under the joint. This work includes:- the removal of the existing joint,- the evacuation of all equipment and materials for removal or demolition,- the preparation of the reservation (pickling, bush-hammering, passivation of the steels, levelling),- the cleaning of the expansion void,- the supply, installation and adjustment of the new joint,- the possible installation of a temporary bridge necessary to put the road back into circulation,- sawing of the asphalt mat and its removal,- supply and installation of anchors and all supplies depending on the type of joint,- reinforcement, formwork and concreting of the sealing areas,- installation and possible supply of waterproofing or water collection systems,- supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas,- the supply and possible installation of special parts of pavement surveys,The services include all the studies, supplies and works necessary for the removal of the existing joints, the transplanting, the temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.
Lot 2: Replacement of mechanical seals on engineering structures (North Network & Opal Coast)The work consists of replacing existing pavement joints on existing structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under joints. This work includes: - removal of the existing joint, - evacuation of all equipment and materials for removal or demolition, - preparation of the reservation (pickling, bush-hammering, passivation of steels, patching), - cleaning of the expansion void, - supply, installation and adjustment of the new joint, - the possible installation of a temporary bridge necessary to put the road back into circulation, - sawing of the asphalt mat and its removal, - the supply and installation of anchors and all supplies depending on the type of joint, - reinforcement, formwork and concreting of the sealing areas, - the installation and possible supply of waterproofing or water collection systems, - the supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas, - the supply and possible installation of special parts of pavement surveys, The services include all the studies, supplies and works necessary for the removal of the existing joints, transplanting, temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.
Lot 3: Replacement of improved coated joints on engineering structures (Eastern Network)The work consists of replacing existing pavement joints on existing structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under joints. This work includes: - removal of the existing joint, - evacuation of all equipment and materials for removal or demolition, - preparation of the reservation (pickling, bush-hammering, passivation of steels, patching), - cleaning of the expansion void, - supply, installation and adjustment of the new joint, - the possible installation of a temporary bridge necessary to put the road back into circulation, - sawing of the asphalt mat and its removal, - the supply and installation of anchors and all supplies depending on the type of joint, - reinforcement, formwork and concreting of the sealing areas, - the installation and possible supply of waterproofing or water collection systems, - the supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas, - the supply and possible installation of special parts of pavement surveys, The services include all the studies, supplies and works necessary for the removal of the existing joints, transplanting, temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.
Lot 4: Replacement of mechanical seals on engineering structures (Eastern Network)The work consists of replacing existing pavement joints on existing structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under joints. This work includes: - removal of the existing joint, - evacuation of all equipment and materials for removal or demolition, - preparation of the reservation (pickling, bush-hammering, passivation of steels, patching), - cleaning of the expansion void, - supply, installation and adjustment of the new joint, - the possible installation of a temporary bridge necessary to put the road back into circulation, - sawing of the asphalt mat and its removal, - the supply and installation of anchors and all supplies depending on the type of joint, - reinforcement, formwork and concreting of the sealing areas, - the installation and possible supply of waterproofing or water collection systems, - the supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas, - the supply and possible installation of special parts of pavement surveys, The services include all the studies, supplies and works necessary for the removal of the existing joints, transplanting, temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.
Lot 5: Replacement of improved coated joints on engineering structures (SAPN Network)The work consists of replacing existing pavement joints on existing structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under joints. This work includes: - removal of the existing joint, - evacuation of all equipment and materials for removal or demolition, - preparation of the reservation (pickling, bush-hammering, passivation of steels, patching), - cleaning of the expansion void, - supply, installation and adjustment of the new joint, - the possible installation of a temporary bridge necessary to put the road back into circulation, - sawing of the asphalt mat and its removal, - the supply and installation of anchors and all supplies depending on the type of joint, - reinforcement, formwork and concreting of the sealing areas, - the installation and possible supply of waterproofing or water collection systems, - the supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas, - the supply and possible installation of special parts of pavement surveys, The services include all the studies, supplies and works necessary for the removal of the existing joints, transplanting, temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.
Lot 6: Mechanical Seal Replacement Work (GCWS)The work consists of replacing existing pavement joints on existing structures such as overpasses or underpasses, bridging cracks and rehabilitating water collection and drainage systems under joints. This work includes: - removal of the existing joint, - evacuation of all equipment and materials for removal or demolition, - preparation of the reservation (pickling, bush-hammering, passivation of steels, patching), - cleaning of the expansion void, - supply, installation and adjustment of the new joint, - the possible installation of a temporary bridge necessary to put the road back into circulation, - sawing of the asphalt mat and its removal, - the supply and installation of anchors and all supplies depending on the type of joint, - reinforcement, formwork and concreting of the sealing areas, - the installation and possible supply of waterproofing or water collection systems, - the supply and installation of drains, the restoration of the continuity of the waterproofing of the structure, including in the survey areas, - the supply and possible installation of special parts of pavement surveys, The services include all the studies, supplies and works necessary for the removal of the existing joints, transplanting, temporary bridges necessary for the restoration of traffic, the repair of the various repaired gasket parts.