Marketing of generated electricity and supplying the MHKW with electricity.
Acceptance and remuneration of the surplus electricity volumes of the MHKW (cf.LV item 3.1)Acceptance and remuneration of excess electricity!
Supply of the MHKW with electricity (see LV point 3.2)Supply of the MHKW with electricity in which the self-supply via 2 existing turbo sets is not available (e.g. due to technical malfunctions, etc.)!
Power supply of the waste transfer stations (MUST'en)Power supply (operational) from 6 garbage transfer stations (MUST'en) in 6 districts!