The WWU Münster needs an institute and laboratory building for the Institute of Planetology (FB 14).
At the same time, there is a need for laboratories, practice and seminar rooms, office space and storage space for other parts of FB 14 (Institute for Landscape Ecology, Unit 1) as well as for the Institute for Behavioral Biology of FB 13, a total of 1,387 m
Due to the necessary spatial proximity of the users to GEO (Heisenbergstrasse 1) and the MIC research building under construction on Röntgenstrasse, the new building is to be erected on the property of GEO 1 (NUF 1-6, total: 2,511 m
- Start of planning: 1.9.2020;
- Handover to the user: 1.6.2025.
The purpose of the order is to provide technical planning services for technical equipment in system group 7 (use-specific systems and process engineering systems; laboratory technology).