Extension of sections with double lane, Um- u. New building from HST, totalers. Waldenburg terminus, construction of a new workshop. On the sat. The route is planned to change to meter gauge and a new security system.
The tender includes civil engineering work in lot 4 excluding track construction work:
Dismantling of the complete track system and the stop systems; Excavation work in the field of roads, engineering structures and tracks, civil engineering in the field of roads, engineering structures and tracks; Civil engineering / foundations for railway systems and platform roof; Creation of platform systems and foundations for platform equipment; Plant management work in accordance with coordinated plant management plans (drainage, BLT, Swisscom, gas, electricity, etc.); Road construction work including road case, edge edging, paving and covering work; Engineering structures such as B. retaining wall, guide wall, ramps or stone basket wall; Special civil engineering (piles, deep foundations).
Extension of sections with double lane, Um- u. New building from HST, totalers. Waldenburg terminus, construction of a new workshop. On the sat. The route is planned to change to meter gauge and a new security system.
The tender includes civil engineering work in lot 4 excluding track construction work:
Dismantling of the complete track system and the stop systems; Excavation work in the field of roads, engineering structures and tracks, civil engineering in the field of roads, engineering structures and tracks; Civil engineering / foundations for railway systems and platform roof; Creation of platform systems and foundations for platform equipment; Plant management work in accordance with coordinated plant management plans (drainage, BLT, Swisscom, gas, electricity, etc.); Road construction work including road case, edge edging, paving and covering work; Engineering structures such as B. retaining wall, guide wall, ramps or stone basket wall; Special civil engineering (piles, deep foundations).