As part of the inner city redevelopment and development concept, the open spaces on the church square are to be redesigned.
The following work must be carried out at a glance:
(all dimensions / quantities approximate)
- 820 m
- 2,000 m
- 725 m
- 330 m
- 200 m
- 650 tons allowance for disposal of soil / stones,
- 2,810 m
- 1 450 m
- 1 450 m
- 170 m
- 200 m
- 2,600 m
- 2,600 m
- Deliver and install 120 m trough plate made of natural stone 60 x 30 x 25 cm,
- Deliver 48 pieces of edging as radial stone made of natural stone, install radius = 1,800 mm,
- 20 pieces of road gullies DIN 4052 made of prefabricated plastic parts,
- 20 attachments for street gullies 300 x 500 or 550 x 500,
- 260 m plastic pipe DN / OD 160 made of PVC-U,
- 70 m solid wall plastic pipe DN / OD 200 made of PVC-U,
- Deliver and install 13 pieces of foundation pipe DN 400 for mast lights,
- Install 13 light pillars supplied by the customer,
- 7 pieces of plastic cable ducts, LW 400 x 400 mm, delivery and installation,
- 360 m
- deliver 4 525 pieces of perennials, grasses, ground cover,
- 4 525 pieces of planting work for grasses, perennials, ground cover,
- 4 pieces of planting pits for trees.