Window construction work, sun protection work for the replacement building
The Verein Gründungskreis Waldorfschule Mainfranken e. V. is planning a new school building for the Freie Waldorfschule in the Mainauen for classes 1 to 8 including some specialist rooms as well as kitchen and. Canteen.
On the property at Ziegelbrunn 10 u. 16 (approx. 5,300 m
Funding from Reg. V. Ufr. claimed.
Construction is scheduled to begin in autumn 2020 and completion of the tree measure by summer 2022.
Window construction work by the Free Waldorf School in the Mainauen Haßfurt in solid concrete construction:
Wood-aluminum window system including venetian blinds
- Window elements wood-aluminum approx. 600 m
- Sun protection external venetian blind systems with track guidance approx. 450 m
- indoor window sills approx. 250 m;
- 1 door swing drive
GFA approx. 2 920 m
BRI approx. 10 800 m