The main and secondary school in Blomberg is gradually being converted into a secondary school. The dry construction work for the 2nd renovation phase is advertised here.
They are in a 3-storey building, approx. 1 150 m
- GK walls and facing shells,
- Acoustic grid ceilings in classrooms (approx. 440 m
- Acoustic perforated ceilings and closed ceilings in the hallways (approx. 260 m