The subject of the Order is: Execution of design documentation for the execution of construction works consisting in the construction of the gas network in msc. Sitno, dz. 54/12, UP/00443546
Material scope:
- gas pipeline dn 63 L = 94,0mb
- connection dn 32 L = 3.0 pcs 1
Based on the conditions of connection to the gas network, as set out in Annex 2 to the contract.
1) the implementation of the construction project, the executive and the object of the works for the task of the following: “The execution of the project documentation for the construction of the construction of the gas network in msc. Sitno, Col. 54/12, UP/00443546", based on the terms of connection of Annex No 2 to the Agreement.
2) obtaining all required opinions, permits and decisions, including obtaining on behalf of and for the Employer, from the competent authority, the final building permit decision;
3) execution of the investor's cost estimate;
4) exercising author's supervision.
A detailed description of the subject matter of the contract and how to implement it is contained in the Description of the Object of the Order (OPZ), Annex 1 to the Agreement and in the Contract Model, Annex 2 to the SWZ.