The subject of the tender is the supply of electrical energy (green electricity) for various consumption points of Lower Saxony municipalities, associations and municipal companies in the districts of Braunschweig, Lüneburg and Weser-Ems.
In the present tender procedure E/0160 (2) - E/0163 (2), the lots which could not be awarded in the previous tender procedures E/0160 Braunschweig District, E/0162 Lüneburg District and E/0163 Weser-Ems District were combined.
The original lot designations have been retained for the present tender procedure E/0160 (2) - E/0163 (2).
Delivery period: 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
The collection points of the participants were divided into 12 regional and individual lots by the tendering body.
For further details, please refer to the service description.
"Helmstedt"Green electricity for approx. 507 consumption points with an electricity consumption of approx. 6,690,553 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
154000 Landkreis Helmstedt
154010 Stadt Helmstedt
154014 Municipality of Lehre
154019 city of Schöningen
154401 Samtgemeinde Grasleben
154402 Samtgemeinde Heeseberg
154500 Own operation of wastewater disposal of the city of Helmstedt
154501 Bäder- und Dienstleistungsgesellschaft mbH Helmstedt
"City of Aurich"Green electricity for approx. 536 consumption points with an electricity consumption of approx. 4,672,520 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
452001 city of Aurich
452503 Auricher Bäder- und Hallenbetriebsgesellschaft mbH & Co. KG
"Landkreis Wittmund"Green electricity for approx. 38 consumption points with an electricity consumption of approx. 1,864,004 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
462000 Landkreis Wittmund
"City of Wittmund"Green electricity for approx. 250 consumption points with an electricity consumption of approx. 2,656,864 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
462019 city of Wittmund
"Gifhorn / Peine"Green electricity for approx. 356 consumption points with an electricity consumption of approx. 3,054,053 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
157002 municipality of Hohenhameln
157005 municipality of Lengede
157007 municipality of Vechelde
"Wastewater disposal Schöppenstedt"Green electricity for approx. 51 consumption points with an electricity consumption of approx. 479,546 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
158500 Abwasserentsorgung Schöppenstedt GmbH
"City of Einbeck"Green electricity for approx. 218 consumption points with an electricity consumption of approx. 1,182,058 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
155013 city of Einbeck
"Salzgitter"Green electricity for approx. 641 consumption points with an electricity consumption of approx. 12,096,126 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
102000 City of Salzgitter
102001 City of Salzgitter (FD 66)
102500 ASG Abwasserentsorgung Salzgitter GmbH
"Osterholz"Green electricity for approx. 111 consumption points with an electricity consumption of approx. 879,076 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
356509 Kulturstiftung Landkreis Osterholz
356001 municipality of Axstedt
356003 municipality of Hambergen
356004 municipality of Holste
356006 municipality of Lübberstedt
356010 Municipality of Vollersode
356401 Samtgemeinde Hambergen
"Aurich"Green electricity for approx. 1,236 consumption points with an electricity consumption of approx. 10,219,221 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
452006 municipality of Großefehn
452007 municipality of Großheide
452011 municipality of Hinte
452012 municipality of Ihlow
452014 municipality of Krummhörn
452025 City of Wiesmoor
452027 municipality of Dornum
452401 Samtgemeinde Brookmerland
452403 Samtgemeinde Hage
452500 Entwicklungs- und Dienstleistungsgesellschaft Ihlow mbH
452501 Touristik-GmbH Krummhörn-Greetsiel
452504 Großefehn Tourismus GmbH
452508 climatic health resort Wiesmoor Touristik GmbH
"Oldenburg"Green electricity for approx. 111 consumption points with an electricity consumption of approx. 2,158,431 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
458500 Bezirksverband Oldenburg
"Wesermarsch"Green electricity for approx. 698 consumption points with an electricity consumption of approx. 10,490,733 kWh/a in the reference year.
It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.
Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).
Losteilnehmer:
461000 District of Wesermarsch
461002 city of Brake
461003 municipality of Butjadingen
461004 City of Elsfleth
461005 Municipality of Jade
461006 municipality of Lemwerder
461007 city of Nordenham
461008 municipality of Ovelgönne
461009 Municipality of Stadland
461507 GIB Entsorgung Wesermarsch GmbH
461508 Tourismus-Service Butjadingen GmbH & Co. KG
461509 Zukunftszentrum Technologie Nordenham-Wesermarsch GmbH