Electricity | Tenderlake

Electricity

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
12 September 2023
Closing Date:
12 October 2023
Location(s):
DE91 Braunschweig (DE Germany/DEUTSCHLAND)
DE93 Lüneburg (DE Germany/DEUTSCHLAND)
DE94 Weser-Ems (DE Germany/DEUTSCHLAND)
Description:
Supply of electrical energy for various consumption points of Lower Saxony municipalities, associations and municipal companies in Lower Saxony. Delivery period from 01.01.2024 to 31.12.2025

The subject of the tender is the supply of electrical energy (green electricity) for various consumption points of Lower Saxony municipalities, associations and municipal companies in the districts of Braunschweig, Lüneburg and Weser-Ems.

In the present tender procedure E/0160 (2) - E/0163 (2), the lots which could not be awarded in the previous tender procedures E/0160 Braunschweig District, E/0162 Lüneburg District and E/0163 Weser-Ems District were combined.

The original lot designations have been retained for the present tender procedure E/0160 (2) - E/0163 (2).

Delivery period: 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

The collection points of the participants were divided into 12 regional and individual lots by the tendering body.

For further details, please refer to the service description.

"Helmstedt"

Green electricity for approx. 507 consumption points with an electricity consumption of approx. 6,690,553 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

154000 Landkreis Helmstedt

154010 Stadt Helmstedt

154014 Municipality of Lehre

154019 city of Schöningen

154401 Samtgemeinde Grasleben

154402 Samtgemeinde Heeseberg

154500 Own operation of wastewater disposal of the city of Helmstedt

154501 Bäder- und Dienstleistungsgesellschaft mbH Helmstedt

"City of Aurich"

Green electricity for approx. 536 consumption points with an electricity consumption of approx. 4,672,520 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

452001 city of Aurich

452503 Auricher Bäder- und Hallenbetriebsgesellschaft mbH & Co. KG

"Landkreis Wittmund"

Green electricity for approx. 38 consumption points with an electricity consumption of approx. 1,864,004 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

462000 Landkreis Wittmund

"City of Wittmund"

Green electricity for approx. 250 consumption points with an electricity consumption of approx. 2,656,864 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

462019 city of Wittmund

"Gifhorn / Peine"

Green electricity for approx. 356 consumption points with an electricity consumption of approx. 3,054,053 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

157002 municipality of Hohenhameln

157005 municipality of Lengede

157007 municipality of Vechelde

"Wastewater disposal Schöppenstedt"

Green electricity for approx. 51 consumption points with an electricity consumption of approx. 479,546 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

158500 Abwasserentsorgung Schöppenstedt GmbH

"City of Einbeck"

Green electricity for approx. 218 consumption points with an electricity consumption of approx. 1,182,058 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

155013 city of Einbeck

"Salzgitter"

Green electricity for approx. 641 consumption points with an electricity consumption of approx. 12,096,126 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

102000 City of Salzgitter

102001 City of Salzgitter (FD 66)

102500 ASG Abwasserentsorgung Salzgitter GmbH

"Osterholz"

Green electricity for approx. 111 consumption points with an electricity consumption of approx. 879,076 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

356509 Kulturstiftung Landkreis Osterholz

356001 municipality of Axstedt

356003 municipality of Hambergen

356004 municipality of Holste

356006 municipality of Lübberstedt

356010 Municipality of Vollersode

356401 Samtgemeinde Hambergen

"Aurich"

Green electricity for approx. 1,236 consumption points with an electricity consumption of approx. 10,219,221 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

452006 municipality of Großefehn

452007 municipality of Großheide

452011 municipality of Hinte

452012 municipality of Ihlow

452014 municipality of Krummhörn

452025 City of Wiesmoor

452027 municipality of Dornum

452401 Samtgemeinde Brookmerland

452403 Samtgemeinde Hage

452500 Entwicklungs- und Dienstleistungsgesellschaft Ihlow mbH

452501 Touristik-GmbH Krummhörn-Greetsiel

452504 Großefehn Tourismus GmbH

452508 climatic health resort Wiesmoor Touristik GmbH

"Oldenburg"

Green electricity for approx. 111 consumption points with an electricity consumption of approx. 2,158,431 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

458500 Bezirksverband Oldenburg

"Wesermarsch"

Green electricity for approx. 698 consumption points with an electricity consumption of approx. 10,490,733 kWh/a in the reference year.

It is specified as an approval requirement that the electricity to be supplied is generated from renewable sources. This includes electricity generated from hydropower, including wave, tidal, salt gradient and current energy, or from wind energy, or from solar radiant energy, or from geothermal energy, or from energy from biomass including biogas, landfill gas and sewage gas, or from the biodegradable fraction of household and industrial waste. The supply of electricity from generation plants with fossil fuels, such as in particular, nuclear power, coal or gas, is not permitted.

Delivery period from 01.01.2024, 0.00 a.m. to 31.12.2025, 24.00 a.m. (2 delivery years).

Losteilnehmer:

461000 District of Wesermarsch

461002 city of Brake

461003 municipality of Butjadingen

461004 City of Elsfleth

461005 Municipality of Jade

461006 municipality of Lemwerder

461007 city of Nordenham

461008 municipality of Ovelgönne

461009 Municipality of Stadland

461507 GIB Entsorgung Wesermarsch GmbH

461508 Tourismus-Service Butjadingen GmbH & Co. KG

461509 Zukunftszentrum Technologie Nordenham-Wesermarsch GmbH

Download full details as .pdf
The Buyer:
Kommunale Wirtschafts- und Leistungsgesellschaft mbH (KWL)
CPV Code(s):
09310000 - Electricity