Rehabilitation of Lam Primary and Secondary School in a first phase of construction; here: Plastering work
school-building
Preparatory work, interior plaster
(e.g. covering windows, soffits, APU strips)
Interior plaster
- 930 m² lime plaster
- 247 m² lime plaster - addition to existing plaster
- 450 m² Putzhaftbrücke
- 1.177 m² Putzarmierung
Gym
Preparatory work, interior plaster
(e.g. covering windows, soffits, APU strips)
Interior plaster
- 420 m² lime plaster
- 199 m² interior plaster for damp rooms
- 618 m² Putzarmierung