The CYEL is a cultural building of about 8000 m2 including:
1 boiler room of 492 kW with 2 gas boilers-1 refrigeration production of 400 kW-1 plate cold exchanger 53 kW- 5 steam lights- 7 air handling units on the roof or technical room -20 air handling units on ceiling-72 surface-mounted climatic beams-3 split-system air conditioning units - 1450 m2 of floor heating-81 hot water radiators-2 electric hot air curtains-3 ventilation extractors-2 pumps for lifting Ep-2 lifting pumps for Eu/Ev- 1 set of control equipment-51 self-controlled fire dampers-13 ECS productions-36 lamella ventilation frame motors-16 ventilation canopy motors-indoor/outdoor blind motors-1 set of electrical cabinets (excluding fire safety equipment and central source)-1 LED comfort lighting installation
the Framework Agreement is for purchase orders and ancillary to subsequent contracts. The purchase orders will make it possible to order the fixed preventive maintenance service as well as the repair services requiring only labor (according to the unit prices fixed in the price schedule). Incidentally, the framework agreement may also be performed in part by the conclusion of subsequent contracts for repair services requiring spare parts not identified in the framework agreement. The Framework Agreement will be concluded for 4 firm years from 1 November 2023 without a minimum amount and with a maximum amount over the total duration of the contract of 400,000 euros (excl. tax).