PU 3356_2 steel-metal construction small jumps + inclined lift.
For the new inclined lift, 2 new intermediate exits will be built to open up the new small hills. The existing exit at the top station will be dismantled and reinstalled on the opposite side. The supporting structure is extended. In addition, a new HS 25 and a new HS 42 small jump will be built. The steel construction receives circumferential railings as well as substructures and sheet metal coverings for the track corridors. All pedestal areas are provided with anti-slip gratings. The Schanz technology includes winches, spurs and snow transporters. The HS 25 will rebuild an existing inrun track. The HS 42 receives a new inrun track.