Design manufacture and build single tier car parks at up to 10 locations to provide a net addition of approximately 1 200 spaces.
The type of contract will be NEC 3 Engineering and Construction Contract June 2005 with amendments June 2006 and September 2011 option A with Contractors Design.
All works to be completed by 4/2/17.