Supervision of project and documentation | Tenderlake

Supervision of project and documentation

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 June 2022
Closing Date:
11 July 2022
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia"

The subject of the contract is the service of performing author's supervision during the period of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia". The scope includes the provision of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, plumbing installations, railway traffic control for the entire area of the Gdynia Port station.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - SRK industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - energy industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the period of construction works under the project entitled: "Improvement of railway access to the seaport in Gdynia" - track industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the period of construction works as part of the project entitled: "Improvement of rail access to the seaport in Gdynia" - road industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - engineering facilities industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - construction and construction industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - overhead contact line industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - energy industry high voltage 110 kV

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the period of construction works under the project entitled: "Improvement of railway access to the seaport in Gdynia" - water and sewage industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

The service of performing author's supervision during the implementation of construction works as part of the project entitled: "Improvement of railway access to the seaport in Gdynia" - teletechnical industry

2. Description of the item of the order

2.1. The subject of this contract is the service of performing author's supervision during the period of construction works as part of the project entitled "Improvement of railway access to the seaport in Gdynia".

2.2. The scope includes the performance of the above-mentioned services in the following industries: teletechnical, electricity, energy, overhead contact line, track, road, construction and construction, engineering facilities, water and sewage installations, railway traffic control for the entire area of the Gdynia Port station, i.e.:

a) Gdynia Port railway station covering the following areas:

 GPA, GPB, GPC, GPD, GPE, GPF,GPW;

 pre-port areas P1-P6, P13-P15 and P16

including accompanying infrastructure;

(b) Associated railway lines:

 Line No. 201: of national importance, first-class, electrified; TEN-T basic freight and comprehensive, double-track from km 205,885 to km 210,374 and single-track from km 210,374 to km 210,763;

 Line 228: of national importance, secondary, single-track, non-electrified, comprehensive TEN-T, from km 5,618 to km 11,227;

 Line 723: of national importance, secondary, single-track, electrified, ten-T basic freight and comprehensive, from km -0,400 to km 2,078;

 Line 724 of national importance, secondary, single-track, non-electrified, TEN-T freight base and comprehensive, from km 1,209 to km 2,157;

 Line No 725: primary, single-track, electrified, ten-T basic freight and comprehensive, from km -0.164 to km 2.247;

 Line No. 961: primary, single-track, electrified, from km 0,000 to km 1,103

2.2. The detailed scope of the contract was included in the OPZ – VOLUME III SWZ.

Download full details as .pdf
The Buyer:
PKP Polskie Linie Kolejowe S.A
CPV Code(s):
45000000 - Construction work
71248000 - Supervision of project and documentation