Baden Conservatory, reconstruction of dragoon barracks, metal construction work
- Elevation of existing railing welded construction with post extension and upper chord made of round steel approx. 100 m
- curtain façade made of perforated trapezoidal sheeting, incl. substructure and thermal insulation, incl. scaffolding approx. 94 m²
- Perforated sheet metal cladding of existing brick-lined basement windows 32 pcs.
- Stainless steel sheet metal cladding on the inside of the elevator shaft approx. 18 m²
- Floor connection bracket made of stainless steel approx. 19 m