Peine Police Department - Complete renovation
Planning performance
Object planning building according to § 33ff HOAI 2021
Power phase (LPH) 2 to 8;
for the demolition of the caretaker's house LPH 5 to 8,
Step-by-step commissioning, i.e. initially LS 1 corresponds to LPH 2 and 3
The Peine police station is located in a residential area north-east of Peine's city centre at Schäferstraße 87.
In addition to the administration building, which is located along Schäferstraße, there is a former caretaker's house, two garage buildings, one of which has a basement, and a precast concrete building in which the emergency power system is located on the grounds of the police station. At the south-eastern corner of the property there is a parking space, which is not bordered by the property enclosure.
The administration building, the garage building and the caretaker's house were built in 1976. In 2009, the building in which the emergency power system is located was erected.
The renovation of the Peine police station is not limited to the administration building, but affects the entire property. Therefore, all of the above-mentioned outbuildings and outdoor facilities are also affected.
Furthermore, as part of the measure, a new garage with 5 garages for company cars is to be built on the property.
Since the construction of the property in 1976, hardly any maintenance and investment measures have been carried out, so that the property - especially the administration building - is in poor condition, both structurally and technically, which has repeatedly led to operational problems in recent years.
The complete renovation of the Peine police station affects all buildings of the property, from the basic renovation of the administration building to the demolition of the foreman's house, as well as the outdoor facilities including the renewal of all pipes.
The building will be cleared for the construction work, so that the construction work will not be carried out during ongoing operations.
The aim of the refurbishment is to create the highest possible functional utility value with appropriate design standards, up-to-dateness in terms of safety and high energy efficiency. For this purpose, considerable interventions in the entire building fabric of the property are required.
The cost ceiling for the construction project is EUR 12,832,056 gross. The costs mentioned include cost groups 200 to 600 according to DIN 276-1:2008-12.
Further information on construction projects can be found in the published task description under the participation documents.
Planning services according to § 33 ff of the HOAI 2021:
It is the planning of 4 buildings on the property of PK Peine:
1. Demolition of the caretaker's house (LPH 5 to 8 according to Annex 10 to §34 HOAI 2021)
2. Complete renovation of the existing administration building (LPH 2 to 8 according to Annex 10 to §34 HOAI 2021)
3. New construction of garages (LPH 5 to 8 according to Annex 10 to §34 HOAI 2021)
4. Conversion of existing garages including planning of the conversion / redesign of the indoor shooting range under the garages into evidence rooms (LPH 2 to 3 and 5 to 8 according to Annex 10 to §34 HOAI 2021)
IMPORTANT INFORMATION:
Queries must be made in writing via the communication tool of the tendering platform up to and including 05.09.2023. All questions received after 05.09.2023 will no longer be answered.