Building 46, New Building Centre for Mental Health (ZSG), Lot 4170 - BOS
The new building Haus 046 is being erected on the grounds of the University Hospital Dresden (UKD). As in some other and neighboring properties on campus, the BOS radio coverage is also to be implemented here. For the BOS radio coverage of the UKD, a campus network with the radio variants TMO and TMOa has been expanded in recent years via a fiber optic network. With the expansion of the fiber optic network for the new building and the required BOS object radio coverage, this object is to be integrated into the BOS radio network expansion.
At the location of House 027 with the central TMO and TMOa system technology as well as the optical master unit, House 046 is to be integrated with system compatibility and integrated into the monitoring and alerting concept. The monitoring and alerting concept includes the signalling of the various radio variants both locally and centrally as well as the remote monitoring of all components for each object supplied. The local activation of the object-related, self-sufficient radio coverage is generally carried out for the respective buildings and interaction with the BMZ concerned.
In the new building 046, all floors and areas (basement with underground car park and the upper floors) are to be continuously supplied with BOS radio coverage via the antenna network to be expanded. The cable components are to be used in accordance with the EU standard EN50575 and Construction Products Directive of 1 July 2017 with the fire protection classification B2ca.
The basis of the expansion are the BOS specifications:
o BDBOS - central (federal organization)
o Federal states/local – Authorized body Saxony and fire brigade Dresden
o Cross-border public transport planning requirements
o DIN 14024-1 (Digital BOS object radio systems, installation and operation)
In accordance with the BOS notification procedure, the new, additional BOS equipment is to be added to the previous status of the notification procedure for the campus supply with all previous, integrated objects and updated in the status.
In addition to the BOS documentation for the notification process and acceptance, the project documents must be prepared in accordance with the specifications of the University Hospital Dresden and as described in the bill of quantities.