1. The item of the order is the delivery of computer equipment for the Władysław Strzemiński Academy of Fine Arts in Łódź.
The Contracting Authority shall divide the order into 5 parts.
Part 1. Portable computer with accessories for AD
Part 2. Portable computer with accessories for IW
Part 3. Mobile computer with acccesories for KP,
part 4. Keyboard and docking station
part 5. MFP
2. Detailed description of the object of the contract, technical parameters of the computer equipment, description of the requirements of the contracting authority for implementation and reception are specified by AD-KP Annexes for Part 1, IW-KP for Part 2, KP-KP for Part 3, IT-KL-ST for Part 4 and MK-D for Part 5 and designed the provisions of the contract.
3. The technical parameters specified in the Annexes are minimum requirements.
Portable computer with accessories for ADThe object of the order is the delivery of a portable computer with accessories. 2. Detailed description of the order, technical parameters of the computer equipment can be found in Annex No AD-KP and in the proposed provisions of the contract. 3. The technical parameters are the requirements of the AD-KP Annex minimum meaning that the Contractor can offer models that comply with minimum requirements or models with more efficient processors (while maintaining technology), more RAM, a larger HDD drive, more I/O ports (of a given type), no shorter warranty, etc.
The Contracting Authority requires that the minimum warranty and warranty period be 12 months. The warranty period begins with the date of signing the receipt protocol of the order item.
The offered item of the order will be complete and ready for use when installed without any additional purchases or investments on the ordering side.
The Contractor declares that the delivered item of the order will be factory new, unreconditioned and free from factory and legal defects and that he has all the required certificates and certificates.
Delivery of the order item will take place at the cost and risk of the contractor.
The Contracting Authority requires that the subject of the contract complies with the requirements of applicable Polish law as well as the law of the European Union, be authorised for marketing and use within the European Union, and complies with other requirements (standards, parameters) specified by the Contracting Authority in SWZ.
The Contracting Authority requires that the order be executed within 21 days from the date of signing the contract.
Note: the timing of the contract is a criterion for assessing tenders
Portable computer with accessories for IWThe object of the order is the delivery of a portable computer with accessories. 2. Detailed description of the order, technical parameters of the computer equipment can be found in Annex No IW-KP and in the proposed provisions of the contract. 3. The technical parameters are the requirements of minimum meaning that the Contractor can offer models that comply with minimum requirements or models with more efficient processors (while maintaining technology), more RAM, a larger HDD drive, more I/O ports (of a given type), no shorter warranty, etc.
The Contracting Authority requires that the minimum warranty and warranty period be 12 months. The warranty period begins with the date of signing the receipt protocol of the order item.
The offered item of the order will be complete and ready for use when installed without any additional purchases or investments on the ordering side.
The Contractor declares that the delivered item of the order will be factory new, unreconditioned and free from factory and legal defects and that he has all the required certificates and certificates.
Delivery of the order item will take place at the cost and risk of the contractor.
The Contracting Authority requires that the subject of the contract complies with the requirements of applicable Polish law as well as the law of the European Union, be authorised for marketing and use within the European Union, and complies with other requirements (standards, parameters) specified by the Contracting Authority in SWZ.
The Contracting Authority requires that the order be executed within 21 days from the date of signing the contract.
Note: the timing of the contract is a criterion for assessing tenders
Portable computer with accessories for KPThe object of the order is the delivery of a portable computer with accessories. 2. Detailed description of the order, technical parameters of the computer equipment can be found in annex no. KP-KP and in the proposed provisions of the contract. 3. The technical parameters are the requirements of the KP-KP annex minimum meaning that the Contractor can offer models that comply with minimum requirements or models with more efficient processors (while maintaining technology), more RAM, a larger HDD drive, more I/O ports (of a given type), no shorter warranty, etc.
The Contracting Authority requires that the minimum warranty and warranty period be 12 months. The warranty period begins with the date of signing the receipt protocol of the order item.
The offered item of the order will be complete and ready for use when installed without any additional purchases or investments on the ordering side.
The Contractor declares that the delivered item of the order will be factory new, unreconditioned and free from factory and legal defects and that he has all the required certificates and certificates.
Delivery of the order item will take place at the cost and risk of the contractor.
The Contracting Authority requires that the subject of the contract complies with the requirements of applicable Polish law as well as the law of the European Union, be authorised for marketing and use within the European Union, and complies with other requirements (standards, parameters) specified by the Contracting Authority in SWZ.
The Contracting Authority requires that the order be executed within 21 days from the date of signing the contract.
Note: the timing of the contract is a criterion for assessing tenders
Keyboard and docking stationThe object of the order is the delivery of a wireless keyboard and a docking station to the hard disk. 2. A detailed description of the order, technical parameters of the computer equipment is provided in Annex No IT-KL-ST and in the proposed provisions of the contract. 3. Technical parameters are minimum requirements meaning that the Contractor can offer models that comply with minimum requirements or models with, e.g., no shorter warranty, in the case of docking stations models that support more equipment, etc. The Contracting Authority requires that a minimum warranty period and The warranty was 24 months. The warranty period begins with the date of signing the receipt protocol of the order item.
The offered item of the order will be complete and ready for use when installed without any additional purchases or investments on the ordering side.
The Contractor declares that the delivered item of the order will be factory new, unreconditioned and free from factory and legal defects and that he has all the required certificates and certificates.
Delivery of the order item will take place at the cost and risk of the contractor.
The Contracting Authority requires that the subject of the contract complies with the requirements of applicable Polish law as well as the law of the European Union, be authorised for marketing and use within the European Union, and complies with other requirements (standards, parameters) specified by the Contracting Authority in SWZ.
The Contracting Authority requires that the order be executed within 21 days from the date of signing the contract.
Note: the timing of the contract is a criterion for assessing tenders
MFPThe object of the order is the delivery of a printing device in color with print function to A4 format, copying and scanning documents and a fax module. 2. A detailed description of the item of the order, technical parameters of the equipment can be found in Annex MK-D to SWZ and in the designed the provisions of the contract. 3. The technical parameters specified in Annex MK-D are minimum requirements meaning that the Contractor can offer models that comply with minimum requirements or models with, e.g., larger processors (while maintaining technology), larger memory, larger disk, more I/O ports (of a given type), no shorter warranty, etc.
The Contracting Authority requires that the minimum warranty and warranty period be 12 months. The warranty period begins with the date of signing the receipt protocol of the order item.
The offered item of the order will be complete and ready for use when installed without any additional purchases or investments on the ordering side.
The Contractor declares that the delivered item of the order will be factory new, unreconditioned and free from factory and legal defects and that he has all the required certificates and certificates.
Delivery of the order item will take place at the cost and risk of the contractor.
The Contracting Authority requires that the subject of the contract complies with the requirements of applicable Polish law as well as the law of the European Union, be authorised for marketing and use within the European Union, and complies with other requirements (standards, parameters) specified by the Contracting Authority in SWZ.
The Contracting Authority requires that the order be executed within 21 days from the date of signing the contract.
Note: the timing of the contract is a criterion for assessing tenders