1) The study of stability and of the technical equipment on the basis of the data from the tender documents and the solution chosen by the tenderer;
2) The completion of the special specifications on the basis of the plans and the specifications provisions already attached to the tender and the completion of the summary measurement;
3) The execution of the works as an obligation to achieve a result for a building that is exploitable in accordance with the applicable regulations, although limited to a ready-to-use building without furniture, loose equipment and consumables.
1) The study of stability and of the technical equipment on the basis of the data from the tender documents and the solution chosen by the tenderer;
2) The completion of the special specifications on the basis of the plans and the specifications provisions already attached to the tender and the completion of the summary measurement;
3) The execution of the works as an obligation to achieve a result for a building that is exploitable in accordance with the applicable regulations, although limited to a ready-to-use building without furniture, loose equipment and consumables.