The object of the order is the implementation of the task: Reconstruction of thermal networks in traditional technology into a network in pre-insulated pipe technology:
Task 1 - in the area of Nowa Niepodległości Street - stage B,
Task 2 - in the area of Żołnierska-Dworcowa Street,
Task 3 - in the area of Metalowa Street,
i.e. execution of construction works consisting in the replacement of existing heat networks made in a traditional system with a heat network in the technology of pre-insulated pipes
in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emissivity of the economy by improving the efficiency of heat distribution in Olsztyn as a result of the reconstruction of the heating network and nodes – stage I"
A detailed description of the subject of the contract specifies:
Task 1 - in the area of Nowa Niepodległości Street - stage B
Appendix 1.1 – Construction project of Nowa Niepodległości Street – stage B
Appendix 1.2 – Bill of quantities at Nowa Niepodległości Street – stage B
Task 2 - in the area of Żołnierska - Dworcowa Street
Appendix 2.1 – Construction project Żołnierska – Dworcowa Street
Appendix 2.2 – Inventory of greenery at Żołnierska – Dworcowa Street
Attachment 2.3 – Measures line Żołnierska Street – Dworcowa
Task 3 - in the area of Metalowa Street
Appendix 3.1 – Construction project of Metalowa Street
Appendix 3.2 – Bill of quantities at Metalowa Street
Form no. 4 - Technical Specification for the Performance and Reception of Works.
The scope of the order:
a) Construction and assembly works:
• dismantling and demolition work,
• earthworks,
• purchase, delivery and installation of fittings, pipelines,
• landscaping and ordering of the land,
• construction of thermal networks,
• Reception required.
b) Execution of surveying inventory and as-built documentation.
In addition, the Contractor is obliged on its own and at its own expense
in particular, to:
• felling of trees and shrubs
• implementation of the BIOZ plan,
• site occupation, including road lanes and payment of related charges,
• notification of property managers of the planned time limit for carrying out the work,
• preparation of the site for construction with its signage,
• development of a road traffic organization project,
• safeguarding the construction site against third party access,
• ensuring the operation of surveying investments,
• solving the question of water and electricity consumption,
• assembly of network by-streaks provided for in the design documentation,
• restoration of the site and pavement to the previous condition, confirmed by the protocol signed by the site manager or owner,
• liability insurance to the extent specified in the draft contract (which is Annex 5 to the SWZ),
• construction insurance against damage likely to occur and from sudden, random events and civil liability works, equipment and construction equipment,
• exportation of debris and other demolition materials, together with waste disposal.
Task 1 – in the area of Nowa Niepodległości Street – stage BThe subject of the contract is the implementation of the task entitled Reconstruction of heat networks in traditional technology into a network in the technology of pre-insulated pipes: Task 1. - in the area of Nowa Niepodległości Street - stage B, i.e. execution of construction works consisting in the replacement of existing heat networks made in the traditional system with a heat network in the technology of pre-insulated pipes in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emissivity of the economy by improving efficiency heat distribution in Olsztyn as a result of reconstruction of heating networks and nodes – stage I"
A detailed description of the subject of the contract specifies:
Task 1 - in the area of Nowa Niepodległości Street - stage B
Appendix 1.1 – Construction project of Nowa Niepodległości Street – stage B
Appendix 1.2 – Bill of quantities at Nowa Niepodległości Street – stage B
Form no. 4 - Technical Specification for the Performance and Reception of Works.
Task 2 – in the area of Żołnierska-Dworcowa StreetThe subject of the contract is the implementation of the task entitled Reconstruction of heat networks in traditional technology into a network in the technology of pre-insulated pipes: Task 2 - in the area of Żołnierska-Dworcowa Street, i.e. the execution of construction works consisting in the replacement of existing heat networks made in the traditional system with a heat network in the technology of pre-insulated pipes
in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emissivity of the economy by improving the efficiency of heat distribution in Olsztyn as a result of the reconstruction of the heating network and nodes – stage I"
A detailed description of the subject of the contract specifies:
Appendix 2.1 – Construction project Żołnierska – Dworcowa Street
Appendix 2.2 – Inventory of greenery at Żołnierska – Dworcowa Street
Attachment 2.3 – Measures line Żołnierska Street – Dworcowa
Form no. 4 - Technical Specification for the Performance and Reception of Works.
Task 3 - in the area of Metalowa StreetThe subject of the contract is the implementation of the task entitled Reconstruction of heat networks in traditional technology into a network in the technology of pre-insulated pipes: Task 3 - in the area of Metalowa Street, i.e. the execution of construction works consisting in the replacement of existing heat networks made in the traditional system with a heating network in pipe technology
pre-insulated in Olsztyn, from the Contractor's materials as part of the project entitled "Reducing the emissivity of the economy by improving the efficiency of heat distribution in Olsztyn as a result of the reconstruction of the heating network and nodes – stage I"
A detailed description of the subject of the contract specifies:
Appendix 3.1 – Construction project of Metalowa Street
Appendix 3.2 – Bill of quantities at Metalowa Street
Form no. 4 - Technical Specification for the Performance and Reception of Works.