Flughafen Köln Bonn GmbH operates an extensive number of passenger boarding bridges at its location.
The contractor undertakes maintenance in accordance with DIN 31051 (maintenance, inspection and repair) as well as other services on the technical systems and equipment - hereinafter referred to as systems, which are listed in the following items. In the respective position, type, location, year of construction, use, technical data of the system(s) are indicated, so that the object of performance can be clearly assessed.
Framework agreement for the maintenance of passenger boarding bridgesA distinction is made between 3 maintenances, the 1st maintenance is due every 4 months,
The 2nd maintenance every 8 months and the 3rd maintenance every 12 months.
In addition, the DGUV3 test must be carried out once a year.
Framework agreement for the maintenance of passenger boarding bridgesA distinction is made between 3 maintenances, the 1st maintenance is due every 4 months,
The 2nd maintenance every 8 months and the 3rd maintenance every 12 months.
In addition, the DGUV3 test must be carried out once a year.