Fire and explosion protection and control consultancy services

Contract Value:
EUR 200K - 200K
Notice Type:
Contract Notice
Published Date:
13 October 2023
Closing Date:
15 November 2023
Location(s):
DE13 Freiburg (DE Germany/DEUTSCHLAND)
DE131 Freiburg im Breisgau, Stadtkreis (DE Germany/DEUTSCHLAND)
Description:
Fraunhofer ISE - 70-00003-2350-H Fire Protection Planning with Explosion Protection

Execution of construction planning services of fire protection planning (with explosion protection) for the Fraunhofer ISE Freiburg - new building HYKOS,

Total costs KG 200-700 (without initial equipment) max. 37,000,000 net (excluding VAT) according to II.2.4).

The implementation of the project takes place in the ZBau procedure including the preparation of an application and construction document as well as the perception of a

Concept discussion with the donors.

Fee offer according to the enclosed service description - see tender documents

Consulting and planning services for fire protection (with explosion protection) for the new construction project HYKOS at the ISE in Freiburg

The planned new building is a research building for the development of hydrogen technologies and fuel cell technology. A special feature here is the high quantities of hydrogen for a research company, which are processed in the building in suitable processes.

A canteen area for the entire campus with a capacity for approx. 750 meals per day as well as a conference centre for use on the ISE campus are to be attached.

The services cover all service phases, and the call-off takes place in two stages (level 1: LPh 2-4 / level 2: LPh 5-8).

The catalogue of services includes all consulting and planning services necessary for the construction of a building that complies with fire protection regulations. A special feature of this project is the high requirements for explosion protection, which are to be integrated directly into the fire protection planning in the course of the service provision.

The work on the project is carried out in close cooperation with the planning team consisting of architects, HVAC and ELT specialist planners and other technical participants as well as the user and the client.

Optional:

It is expected that another building directly adjacent to the new building will be erected on the site. It can therefore be assumed that, in addition to the purely functional one, there will also be a spatial connection between the two buildings. The planning "core" team should therefore be reassigned if necessary to ensure consistency in planning and execution.