The contractor is responsible for designing and supplying two remotely operated in-cave Annealing Furnaces along with associated control systems, cables, gas bottles, design documentation, and quality records, while installation will be handled by NNL.
Annealing Furnace. What is included The contractor shall design, supply all materials and components, assemble, inspect, test, package and deliver the equipment and supporting documentation as specified in this document. Specifically, the contractor shall supply; • 2 remotely operated in-cave Annealing Furnaces. • 2 out of cave control systems. • 2 sets of umbilical cables to connect the in-cave rigs to the out of cave control systems. • 2 sets of gas bottles and manifolds for inert gas. • Design documentation for the Annealing Furnaces in accordance with the contractor’s own quality management system procedures. For example, drawings, calculations, design risk assessments, basis of design etc. • Quality plan. • Programme of work and monthly progress reports. • Factory acceptance test schedule. • A technical file with a Declaration of Conformity that CE or UKCA marks the Annealing Furnaces • Lifetime quality records file.
What is included The contractor shall design, supply all materials and components, assemble, inspect, test, package and deliver the equipment and supporting documentation as specified in this document. Specifically, the contractor shall supply; • 2 remotely operated in-cave Annealing Furnaces. • 2 out of cave control systems. • 2 sets of umbilical cables to connect the in-cave rigs to the out of cave control systems. • 2 sets of gas bottles and manifolds for inert gas. • Design documentation for the Annealing Furnaces in accordance with the contractor’s own quality management system procedures. For example, drawings, calculations, design risk assessments, basis of design etc. • Quality plan. • Programme of work and monthly progress reports. • Factory acceptance test schedule. • A technical file with a Declaration of Conformity that CE or UKCA marks the Annealing Furnaces • Lifetime quality records file. What is excluded NNL shall supply; • Suitable non-active material samples for factory acceptance tests. • Installation at NNL’s Windscale facility.