The project consists of the renovation of the Bonnenfant school group in Saint-Germain-en-Laye (78). The school group is made up of six distinct areas detailed in the documents of the Business Consultation File (DCE). This consultation only concerns lots 1b, 2, 3a, 3b and 4 of the contract. Lots 1a, 1c and 6 will also be the subject of further separate consultations, according to the appropriate procedure reserved for "small lots" as provided for by article R.2121-1 of the public procurement code. As an indication, the provisional date for notification of works contracts and the start of the site preparation period is set at 5.7.2021.
Structure - plaster (macro-batch)Structural work - timber frame - ITE metal frame and facelift.
Envelope (macro-batch)Zinc cover - waterproofing of exterior joinery - blackouts of locksmith cladding.
Heating - ventilation - plumbingHeating - ventilation - sanitary plumbing.
Second work (macro-lot)Partitions - linings - false ceilings wood interior joinery - furniture flexible floors tiling - earthenware painting.
Electricity strong currents and weak currentsElectricity strong currents and weak currents.