Civil engineering work for the renovation and conversion of a school
As part of the renovation and partial conversion of a school building (B) from the 1970s, manufactured in large panel construction (WBS 70), without basement, 4 full floors, as well as a largely detached building with a swimming pool system (therapy bath), manufactured in conventional construction, basement, 1 full floor, the following construction services are awarded in public tender:-
The civil engineering works include:
- 180 m rainwater pipe DN 100 - 200 PP with bedding
- 102m sewage pipe DN 100 - 200 PP with bedding
- 40 m sewage pipe DN 100 - 200 PE with bedding
- 17 branches rainwater pipe DN 100- 200 PP
- 25 branches sewage pipe DN 100- 200 PP
- 38 pieces of arch rainwater pipe DN 100- 200 PP
- 34 bends sewage pipe DN 100- 200 PP
- 11 pieces of elbow sewage pipe DN 100- 200 PE
- 19 pieces welding sleeve PE
- 20 m pipe PB-H TW AD 63mm
- 10pcs angle PB-H TW AD 63mm
- 30 m pipe steel AD 80-100mm
- 1 piece of grease trap system
- 3 cleaning shaft DN 600
- 5 pieces inspection shaft DN 400
- 1 piece sampling shaft PE small sewage treatment plant
- 445 m3 trench loosen feed backfill compacting
- 600 m Durchörterung DN 63-160
- 11 pieces of cable construction shaft
- 2350 m Kabelschutzrohr DN 90 - 160