Construction preparation and construction-accompanying explosive ordnance clearance
The right Elbe dike southwest of the town of Havelberg is used as a flood damage removal measure "HWSB re. ED Sandau-Havelberg km 81,875 - 85,5" expanded according to the current requirements for a flood protection system. In this case, an increase and landside widening will be carried out while retaining the previous route. In the designated dike section as well as ancillary areas necessary for the construction, explosive ordnance clearance is necessary before ground-intrusive measures.
Preliminary exploration of the Elbe main dike and ancillary areas
- Probing/clearing dike and ancillary areas: 32.750m²
- Probing/clearing of watercourse edge strips: 825m²
- Probing/clearing of woody areas: 3.850m²
KMR accompanying construction in the course of the dike construction measure