Heating, ventilation, sanitary and electrical installations.
Heating, ventilation and sanitary installationsConnection to existing heating system — Drinking water storage system — 900 m
Lightning arrester installation — two distribution panels — cable trays — 350 switches and sockets — 300 lights (indoor — outdoor — emergency) — fire detection — intrusion — computer network — nursing call — parlophone — monitoring. Start of work: beginning of January 2022. Duration of work: 135 working days. Minimum conditions for participation: three similar references. Number of people: min. 20