The new ZOP/ZSVA measure is located relatively centrally on the property of Imland Klinik Rendsburg. The building will be erected as a 3-storey new building using conventional construction methods and will be directly connected to the existing buildings on the north and east sides. To the east is the main building with the current operating room on the ground floor and central sterilization in the basement, which will be converted after the completion of the new building. The main route will be via this connection. The adjacent parts of the building remain in their static structure, and conversion is primarily carried out in dry construction.
2 x RDGE
2 x drying ovens RDGE
+ accessories