Renovation of the outdoor swimming pool in Esslingen-Berkheim:
The NRF is about 1 870 m
The following measures are to be implemented in the course of the upcoming refurbishment:
- total renovation of the inner and outer pools (stainless steel lining),
- Renovation of the foyer, changing room and sanitary area,
- complete renewal of the technical building installations (heating, ventilation, sanitary, electric and bathing water technology),
- barrier-free access,
- energetic upgrading of the building envelope.
Work is expected to start from September 2019-May 2021.
Insulation work on ventilation systems:
- Mineral wool insulation on ducts rectangular and round - about 750 m
- Soft foam insulation on air ducts rectangular - approx. 230 m
- Fire protection clothing on air line - approx. 20 m
Insulation work on heating systems with mineral wool and soft foam:
- Pipes with fittings partly with sheathing - approx. 480 running meters,
- insulation on fittings - approx. 85 pcs,
- Fire protection insulation - approx. 16 pcs.
Insulation work on sanitary facilities with mineral wool and soft foam:
- Pipes with fittings partly with sheathing - approx. 1200 m,
- Insulation on fittings partly with sheathing - approx. 35 St.
- Fire protection insulation - approx. 30 pieces