Replanning of the open space Gustav-Hennig-Platz in Gera into a high-quality public green space with playground, recreational and recreational character, including a new version of the associated traffic area Amthorstraße and Rudolf-Diener-Straße; Property planning according to HOAI in accordance with § 40 in conjunction with § 48 HOAI traffic facilities; first processing of phases 1-3 plus VAT. Special services; optional further assignment planned in the event of a positive funding decision
Replanning of the open space Gustav-Hennig-Platz into a high-quality public green space with playground, recreational and recreational character, including a new version of the associated traffic area Amthorstraße and Rudolf-Dienerstraße, taking into account the following functions and conditions:
1. Open space - urban green spaces (estimated construction costs: 870,000 EUR net)
• Creation of a combined multifunctional green and open space of ecological, social and urban significance
• Strengthening the green open space structure in the city centre, including increasing and improving the quality of life for the population
• Creation of a themed playground according to the playground development concept for children aged 0-12 years and wheelchair users; Size: 1,000 sq.m.; Topic: (Puppet) Theatre
• Creation of a sustainably attractive water surface with feeding roof areas
• Creation of an attractive "forecourt" for the users of the puppet stage
• Preservation of the municipal tree population - vitality level 0-2
• Processing of the green space under the theme of increasing biodiversity
• Integration of existing urban art
• Classification of a multifunctional lawn for the purposes of temporary use, theatre and fire brigade assembly point, justice centre
• Examination of the classification of solar park lighting
• Examination, classification or implementation of a public toilet
• Observance of the guidelines of urban development funding in connection with "Future Urban Green" in the design of the facility under the aspect of a sustainable urban green
• Implementation of accessibility measures.
2. Transport facility - civil engineering areas (estimated construction costs: EUR 1,525,000 net)
• Creation of traffic areas in basic construction; i.e. closure of Rudolf-Diener-Straße for motor traffic between Schlossstraße and Amthorstraße
• Observance of destination traffic (entrance to the police station Amthorstraße 6 - emergency vehicles 24/7; Entrance Amthorstraße 1 - Prisoner supply and on-call service 24/7; Amthordurchgang Rudolf-Diener-Straße 2 - prisoner supply and on-call duty 24/7; Rudolf-Diener-Straße 1 - Employee parking spaces for the judiciary; Rudolf-Diener-Straße 2/main entrance - postal delivery justice; Amthor Passage - economic access to trade; Puppet Theatre - Delivery Theatre)
• Observance of current utilization of stationary traffic
• Provision of parking spaces for police forces in connection with the operational situation at the police and judiciary, as well as 3 disabled parking spaces
• Classification and testing of barrier-free cross-sections
• Classification of new street lighting including underground installation space and city network system
3. Attention to the requirement profile of theatre, puppet stage
• Strengthening the cultural significance of the theatre by improving its impact on public space
• Attention to the renovation concept for the puppet stage, planned end of construction 12/2024
• Barrier-free access to the building with appropriate access areas
• Creation of a delivery access road for 3-axle trucks
• Classification of 2 disabled parking spaces and bicycle parking spaces for the theater
• Creation of a disposal point
4. Consideration of higher-level planning:
• Integrated urban development concept Gera-ISEK Gera 2030
• Redevelopment area "city center" S/07/00 and extension of the deadline for redevelopment statutes incl. evaluation report
• Framework plan for the public space of the city centre of Gera with urban floor concept
• Observance of playground development concept 2030
• Observance of the Transport Development Plan 2010
• Attention to integrated cycling concept
5. Observance of monument protection - Monument ensemble Old Town
6. Evaluation/evaluation of the old design plan from 2000/2001
7. Coordination of other planning services, e.g. management bodies