Earthworks and special foundation engineering work for the construction project "Lagarde 2 - Quartiershaus und Medical Valley"
Investigation of combat
Explosive ordnance exploration incl. exploratory drilling
earthwork
approx. 73,500m3 of floor material loosen and load
(Excavated material is partly temporarily stored and partly transported/disposed of)
Produce approx. 8,500 m2 of work plan for the introduction of sheet piling
Sheeting work
approx. 9,000 m loosening boreholes (sheet piling)
approx. 4,200 m2 sheet piling
ca. 4.600 m Temporäranker
MIKROPFÄHLE
ca. 4.700 m Mikropfähle