Klinikum Lippe Detmold, Construction Final Cleaning Trade
The construction project includes the new building component C to 2nd floor following an existing building. For the
Transitions will require reconstruction work in individual areas and floors. There is an expansion of the
1.OP cluster, the 2nd OP cluster is initially only created as a shell.
9,400 m² floor plan area for final building cleaning with approx. 1,400 m² windows and exterior doors, approx. 535m² sun protection, approx. 4,000 m² PVC floor coverings, approx. 960m² tile coverings, approx. 1,500m² floor areas with paint as rough and building cleaning