The University of East Anglia (UEA) has appointed Principal Contractors to carry out construction and refurbishment works over the duration of the Framework.
The Framework consists of three lots based on the value of the proposed works contracts:
Lot 1 - Mid Works >£1m to ≤£5m
Lot 2 - Minor Works £0k to ≤£1m
Lot 3 - Mechanical and Electrical Works £0k to ≤£900k
The UEA has established the framework so that it has a pool of contractors from whom it can call-off directly or seek tenders (via mini-competitions) for specific projects as they arise.
This will not necessarily guarantee a contractor work during the 3-year life-time (note there is an option for the University to extend the Framework by up to 2 years but this is at the sole
discretion of UEA) of the Framework; neither will UEA be restricted exclusively to using Contractors from the Framework.
This Lot is for works with a construction value of >£1m to ≤£5m GBP. Estimated spend on this Lot over a 5 year framework period is anticipated to be 8 500 000 GBP to 33 500 000
GBP. The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three (3) years with an
option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA). In addition to the UEA, The
Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.
This Lot is for works with a construction value of £0k to ≤£1m GBP. Estimated spend on this
Lot over a 5 year framework period is anticipated to be 10 500 000 GBP to 45 750 000 GBP.
The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three (3) years with an option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA).
In addition to the UEA, The Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.
This Lot is for mechanical and electrical works with a construction value of £0k to ≤£900kGBP. Estimated spend on this Lot over a 5 year framework period is anticipated to be
up to 17 000 000 GBP. The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three
(3) years with an option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA). In
addition to the UEA, The Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.